Invert-Logo
Vendor Enablement Process Optimization For A Multi-National Energy Conglomerate Case Study
Case Study

Vendor Enablement Process Optimization For A Multi-National Energy Conglomerate

Client

A fortune 500 American multinational conglomerate operates through the multiple segments like aviation, healthcare, power, etc.


Industry

Manufacturing

Vendor Enablement Process Optimization For A Multi-National Energy Conglomerate Case Study

Challenges

The client had more 50,000 suppliers around the globe and they wanted to reach out to them for collecting mandatory data.

They wanted a Centralized repository to be access vendor-specific information at a single location, including mutual non-disclosure agreement, supplier integrity letter, country-specific tax documents, etc.

Solution

After a thorough due-diligence, Datamatics recommended a centralized repository for helping the client collect data from globally located vendors.

Datamatics implemented its bpm solution Finato powered web-based e-supplier portal to improve the visibility, use standard templates and create a transparency between channel partners & the client by providing real-time status updates.

Download Case Study

Impacts

30% Cost savings

30%

Cost savings based on manual baseline

Institutionalized an online validation process of vendors’

Institutionalized an online validation process of vendors’ master data in the e-supplier portal

Set up a workflow-driven approach

Set up a workflow-driven approach for approval routing and e-mail notifications

Provided auto-alerts and reminders to suppliers

Provided auto-alerts and reminders to suppliers based on the specifications

Download this Vendor Enablement Process Optimization Case Study Now

Just fill out this form to download the case study.